ESSENTIAL works are set to take place at the busy Whitletts Roundabout in Ayr for two weeks.
Amey is undertaking essential resurfacing on the A77 at the roundabout from Tuesday, November 5 until Wednesday, November 20.
The maintenance forms part of a package of resurfacing works on the A77 this autumn/winter, which will include Bankfield Roundabout and Holmston Roundabout.
Resurfacing of the Whitletts Roundabout will take place in six phases and the programme of traffic management is as follows:
Phase one: Lane closures
- 8pm-6am each night, Tuesday, November 5 until 6am Friday, November 8
- Lane closures on the approach to the A77 northbound from the A719 and the B743 Heathfield.
- 8pm Thursday, November 7 until 6am Friday, November 8
- Lane closures on the A77 southbound approach to Whitletts Roundabout and the A77 northbound departure from the roundabout.
Phase two: Roundabout partial closure and exits full closures
- 11pm Friday, November 8 until 6am Monday, November 11
- There will be a total closure of the northbound section of the roundabout with a contraflow in operation for the southbound. The A719 roundabout arm will also be closed during this period.
- A77 traffic intending to travel northbound will be diverted to turn left onto Highfield Drive, and left again to join the B743 Heathfield Road, before turning right onto Ayr Road. From here, traffic will follow the A79 northbound and then A78 southbound, re-joining the A77 at Dutchhouse Roundabout.
- A77 traffic intending to travel southbound will be diverted to turn left onto Highfield Drive, and left again to join the B743 Heathfield Road, before turning left onto the A79 Ayr Road. From here, traffic will continue through Allison Street, John Street, and Station Road. At the A70 Holmston Road, traffic will be able to rejoin the A77 at Holmston Roundabout. Traffic for the Whitletts area will follow the above diversion in reverse.
- The B743 Heathfield Road roundabout arm will also be closed with A77 northbound traffic directed to turn right onto Low Road to join the A719, before turning right onto Allison Street. From here, traffic will continue through Ayr Road, Main Street, the A79 northbound, and A78 southbound to re-join the A77 at Dutchhouse Roundabout. A77 southbound traffic will turn right onto Low Road, taking a further right turn onto the A719, before turning left onto John Street. From here, traffic will continue through Station Road onto the A70 Holmston Road, where it will be able to re-join the A77 via the Holmston Roundabout. Traffic for Ayr via Heathfield Road will follow the above diversion in reverse.
- A77 northbound traffic intending to travel on the B743 eastbound towards Auchincruive will be directed to continue on the A77 through the contraflow and will exit at Sandyford Toll Roundabout to be able to access the B743. Westbound traffic from the B743 Auchincruive will join the southbound A77 and choose appropriate diversion for onward travel.
Phase three: Lane closures
- 8pm-6am each night, Monday, November 11 until 6am Friday, November 15
- Lane closures on the approach to the A77 southbound including the B743.
Phase four: A77 mainline closure
- 8pm Thursday, November 14 until 6am Friday, November 15
- There will be a closure of the A77 southbound between Sandyford Toll Roundabout and the B743 exit at Whitletts Roundabout. Traffic will be diverted via the B742, A719, B730 and B743.
- Traffic wishing to access the B743 east will follow the A77 north to Sandyford Toll Roundabout and then follow the above diversion.
Phase five: Roundabout partial closure and exits full/partial closures
- 9pm Friday, November 15 until 6am Sunday, November 17 then 11pm Sunday, November 17 until 6am Monday, November 18
- There will be a total closure of the southbound section of the roundabout with a contraflow in operation for the northbound.
- Traffic from the B743 Heathfield Road roundabout arm will not be able to join the A77 southbound and will follow the northbound A77 to Sandyford Toll Roundabout and return south through the works.
- The A719 roundabout arm will be closed. Traffic will turn right onto Low Road then right onto A719 and right onto Allison Street to follow Ayr Road, Main Street, the A79 and the A78 to rejoin the A77 at Dutchhouse Roundabout. Southbound traffic will return through the works.
- The B743 East roundabout arm will be closed. Traffic for the B743 will follow the A77 north to Sandyford Toll Roundabout then follow the B742, A719, B730 and B743. Traffic wishing to join the A77 from the B743 East will follow the above diversion in reverse.
- Traffic from the southbound A77 wishing to exit for Heathfield Road or the A719 will follow A77 southbound to Holmston Roundabout and return north to access the junctions.
Phase six: Lane closures
- 8pm Tuesday, November 19 until 6am Wednesday, November20
- Lane closures will be required on the A77 southbound approach to Whitletts Roundabout and northbound departure from the roundabout.
Access for emergency service vehicles will be maintained throughout the works.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here